This tool is for educational and preliminary-estimate purposes only; production planning, costing and capacity decisions should be verified against the business's actual ERP/MES data and a process/industrial engineer's assessment.
Planned production time (min)
Downtime (min)
Ideal cycle time (sec/unit)
Total units produced
Good (quality-passed) units
Availability
87.50 %
Performance
83.33 %
Quality
95.00 %
OEE
69.27 %
OEE Calculator
Open with ToolsQube ↗