SIMULATIONS · Ages 12+
Pour Day
You are the site foreman: choose the mix (the water-cement ratio sets strength and flow), decide whether to cover and warm the pour in cold weather, then let the days pass and strip the formwork once the concrete is strong enough. Strip too early and it collapses; wait too long and every day costs money.
How to play
- 1Read the target strength, the consistency class and the weather forecast.
- 2Set the water-cement ratio: both strength and consistency must be suitable. In cold weather consider the cover option.
- 3Pour, let the days pass and watch the strength chart; a cube test is never exact.
- 4Strip once the strength reaches what is needed: strip early and it collapses, pass the deadline and you lose money.
What you learn
- How the water-cement ratio changes strength and flow
- That concrete matures according to temperature
- That waiting has a cost too
- How to balance safety against speed
The tools behind this simulation
For learning. Prices and products are made up and do not reflect a real brand or store. Nothing is saved or sent.