Line Balancing Calculator
Line Balancing Calculator calculates cycle time (the slowest/bottleneck station), total task time, line balance efficiency and total idle time from a production line's workstation task times.
This tool is for educational and preliminary-estimate purposes only; production planning, costing and capacity decisions should be verified against the business's actual ERP/MES data and a process/industrial engineer's assessment.
Total task time150.00
Cycle time (bottleneck)45.00
Line balance efficiency83.33 %
Idle time30.00
How it works
- 1Enter each station's task time (sec) in order.
- 2Use 'Add station' to add more stations if needed.
- 3Read the cycle time, total task time, line efficiency and idle time.
Frequently asked questions
Why does cycle time equal the slowest station's time?−+
The line can only run as fast as its slowest (bottleneck) station; every other station must wait on it.
What would 100% line balance efficiency mean?−+
Every station's task time would be equal and there would be zero idle time, rarely achieved in practice.
What should I do if efficiency is low?−+
Redistributing (rebalancing) tasks across stations so their times are closer together improves efficiency.
Embed on your site
Size
480 × 360px<iframe src="https://toolsqube.com/en/industrial-engineering/line-balancing-calculator/embed" width="480" height="360" style="border:0;border-radius:14px" title="Line Balancing Calculator · ToolsQube" loading="lazy"> </iframe>
Want to go deeper on this topic: Production Efficiency Guide →