Takt Time Calculator
Takt Time Calculator calculates how frequently a product must be completed to meet customer demand (takt time = available time / demand). Used in lean manufacturing to pace the line to match demand.
This tool is for educational and preliminary-estimate purposes only; production planning, costing and capacity decisions should be verified against the business's actual ERP/MES data and a process/industrial engineer's assessment.
Takt time60.000 sec/unit
How it works
- 1Enter the available production time (sec).
- 2Enter customer demand per shift/period (units).
- 3Read the takt time.
Frequently asked questions
What's the difference between takt time and cycle time?−+
Takt time is the 'target' pace dictated by demand; cycle time is the line's actual production pace. When they're equal, the line exactly matches demand.
Does available time include breaks?−+
No, available time is usually the net working time after subtracting planned breaks, shift changeovers and similar stoppages.
How does takt time change when demand changes?−+
As demand rises, takt time shortens (faster production is needed); as demand falls, it lengthens, update the values and recalculate.